Remove Tag?

Do you want to untag yourself from this post?

USS Curie

Kirn System, Starbase 842, Dry Dock - Shakedown

The last two weeks had been a blur as final details, tests, walkthroughs, and the like culminated in the USS Curie, NCC 74329-A, final shake down approached.
The plan was to run the ship at impulse while in the Kirn system, then do a series of four warp jumps to test the warp engines. Meanwhile the other Departments would be doing various routine ships systems operations to ensure everything worked before they left on their mission.

  • Jessip Quirst, CO.

Use the full posts index to browse this ship's thread list.

Open Full Posts Index