Remove Tag?

Do you want to untag yourself from this post?

USS Ogawa

Carraya IV - Engineering Team

Mark and the rest of the engineers rounded the corner to find the makeshift generator setup. “Right. Easter. Check all the connections between the generator and the clinic. Make sure everything is in the right place and compatible with both sides. I’ll look at the generator itself.” He knelt down to examine the generator. He pulled out his tricorder and started scanning. As much as he trusted the scans, he gave the generator a good look manually as well.

-Lt(j.g.) Mark Pierce, CE

Use the full posts index to browse this ship's thread list.

Open Full Posts Index