USS Olympic
Bridge: Main Sim
Posted by Lieutenant Sural (Chief Engineer) in Bridge: Main Sim
After the second announcement, a rather expected comms reached the bridge from engineering. =^= Sural to bridge. Has there been a change in ship status regarding command code authorization? =^=
- Sural
Ooc: To make a short and sweet note here. All command level functions, navigation, weapons, and shield systems have been locked out.
-GM