SS Sojourner
Main Sim - ENGINEERING - And away we go
Posted by Captain Arialla Bovar (Captain) in Main Sim - ENGINEERING - And away we go
Ari’s orders came to the Chief Engineer’s console in time for shift pass down.“Going to need large sweeps of passive scans in approaching nebula. Please see that ship resources are set and available. Please also keep warp on standby. No unnecessary shut downs or test runs of systems till further notice. Thank you”
Ari
CO
As the ship approached the nebula reports of malfunctions were some minor systems came in across the ship. Whatever was happening in the nebula was causing some problems with EPS systems. A report soon came in from the Bridgehead that the backup universal translator system blew at the Commander’s console, while at the same time a secondary sensor array on C-Deck went down and an alarm rang to note a minor power surge through B-Deck’s internal comm system relays.
Main power was not affected - thrusters, impulse, warp drive, and weapons were all online and showing no trouble.
GM Roadrunner